STC Easy2Build Easy-Grow Assembly Instructions Manual page 18

8’ x 10’ greenhouse
Hide thumbs Also See for Easy2Build Easy-Grow:
Table of Contents

Advertisement

Slide hex nuts and bolts into U-cutout in side of pro les L13B and L13C. Tighten
2.4A
securely to hold in place.
Secure connectors with six S02 screws.
2.4B
L13E
L13C
L13E
Place brace L15A onto door lining up the holes on each end with the holes in pro les L13E
2.5
and L13B. Slide hex bolt so it ts through hole in brace. Secure brace with two S02 screws
and S14 hex nut.
L13E
L13C
S02
NOTE: ALL VIEWS ARE FROM INSIDE.
www.stcny.com
NOTE: The holes at the top of pro le L13B and the bottom
left corner of pro le L13E will be secured in Step 2.5.
L13C
L13B
L15A
NOTE: The hole for hex bolt is not at the midpoint of brace. Turn brace
until all holes line up. Brace will dip slightly when hex bolt is secured.
L13B
S02
Brace
#L15A
16 of 57
L13B
L13E
L13E
Screw
#S02
S14
L13E
Screw / Nut
QTY
#S02
1
#S14
QTY
6
QTY
2
1

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Easy2Build Easy-Grow and is the answer not in the manual?

Questions and answers

Robert S Antos
April 22, 2025

need plastic v-shaped strips to hold greenhouse plastic into corners. I have a 6x10 Poly Greenhouse. According to manual it is part # 35 the v - locker

Table of Contents