STC Easy2Build Easy-Grow Assembly Instructions Manual page 44

8’ x 10’ greenhouse
Hide thumbs Also See for Easy2Build Easy-Grow:
Table of Contents

Advertisement

8.5A
Line up pro les L08A and L02H as shown. L08A has a cutout on one end. The plain side slides into
V-channel of pro le L02H. Note the rectangular holes in the channels of pro le L02H are NOT on
the side next to the V-channel.
L08A
L08A
IMPORTANT: There is one correct way to connect these
pro les. Arrange pro les before sliding together. Use
WD40 or liquid soap if parts do not easily slde together.
Using a small step ladder inside the greenhouse, carefully slide pro le L02H with L08A and L08B
8.6A
connected into front connector S18 at a slight angle. Gently push center gable slightly towards
the back to slide other end of pro le into connector S21. Make sure both connectors click
securely into place. Note: L02H pro le rests on top of S22 connectors.
IMPORTANT: Make sure pro le L02H with L08A are in correct positions before installing. Arrange pro le L02H
so rectangular holes in channels face the LEFT when looking at the front of the greenhouse from the outside.
S18
8.6B
Slide pro le L02G at a slight angle into center gable connector S21. Gently push back side
slightly forward to slide other end of pro le into connecor S12. Make sure both connectors
click securely into place. Note: pro le L02H rests on top of S22 connectors.
!
There is only one way to properly fasten connectors into pro les. Line up parts
rst to ensure correct placement. Slide connectors until they CLICK securely into
pro le. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
www.stcny.com
8.5B
L08A
L02H
L02H
L02H
S22
S22
IMPORTANT: Arrange pro le L02G so rectangular holes in channels face
the LEFT when looking at the front of the greenhouse from the outside.
Connectors S21 and S12 CLICK into place.
42 of 57
Slide the plain side of L08B into V-channel on
opposite side of pro le L02H.
L08B
L02H
L02H
L08A
Pro le
QTY
#L02H
1
L08A
S21
S21
S22
L08B
L08B
Pro le
QTY
1
#L08A
1
#L08B
Connectors S18 and
S21 CLICK into place.
L02G
S12
Pro le
QTY
#L02G
1

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Easy2Build Easy-Grow and is the answer not in the manual?

Questions and answers

Robert S Antos
April 22, 2025

need plastic v-shaped strips to hold greenhouse plastic into corners. I have a 6x10 Poly Greenhouse. According to manual it is part # 35 the v - locker

Table of Contents