Prepare Shelves - STC Easy2Build Easy-Grow Assembly Instructions Manual

8’ x 10’ greenhouse
Hide thumbs Also See for Easy2Build Easy-Grow:
Table of Contents

Advertisement

Prepare Shelves

Place all the parts for the shelves on a level surface.
Make sure the pieces are in the correct positions before assembling.
!
Carefully follow the order of assembly to ensure an easy installation.
Wear proper safety gear including work shoes, gloves and goggles.
Line up the shelf pro les so the holes are at the same position. Slide long side of
5.1A
connector S37 into channel of each pro le, lining up the last hole on the
connector with the hole in the channel.
S37
L14M
IMPORTANT: The shelf pro les have rectangular holes in the channel or side of one end.
Slide connector S37 into other side, lining up last hole in connector with hole in the channel.
5.1B
Secure with S02 screw.
S37
www.stcny.com
L14D
L14L
L14A
S02
L14C
L14K
Connector
QTY
#S37
#S02
34 of 57
L14B
L14N
S37
Pro le
Pro le
#L14A
#L14M
#L14B
#L14N
#L14C
#L14K
8
#L14D
#L14L
8
QTY
1
1
1
1
1
1
1
1

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Easy2Build Easy-Grow and is the answer not in the manual?

Table of Contents