Assemble Doors
Place all the parts for both doors on a level surface.
Make sure the pieces are in the correct positions before assembling.
!
Carefully follow the order of assembly to ensure an easy installation.
Wear proper safety gear including work shoes, gloves and goggles.
!
Both doors are assembled with the outside face to the ground. ALL VIEWS ARE SHOWN FROM INSIDE.
2.1A
Slide three hex bolts S13 into
channel of pro le L05I.
L05I
Remove protective plastic from both sides of panels Y25. Place side to face toward the sun facing
2.2
down. Fit panels into channels of pro le L05I.
L05I
Place door pro les L13B, L13C and
2.3
L13E next to connectors S28 around Y25 panels
as shown. Slide connectors into pro les. Make sure
panels and pro le L05I t into V-channels of each pro le. S28
connectors will be secured to pro les in Step 2.4
L13E
S28
NOTE: ALL VIEWS ARE FROM INSIDE.
Panel
#Y25
www.stcny.com
S13
!
S28
L13C
Pro le
QTY
QTY
2
#L05I
1
2.1B
Screw two S14 hex nuts onto
bolt on each end. Do not
completely tighten.
Remove protective plastic from EACH side of poly carbonate
panels before installing. Dispose of plastic properly. Install with
side labeled "Face this side towards the sun" FACING DOWN.
L05I
L13B
S28
Bolt / Nut
Pro le
QTY
#S13
3
#S14
2
15 of 57
S14
L05I
S28
S28
L13E
Connector
QTY
#L13B
1
#S28
#L13C
1
2
#L13E
QTY
4
Need help?
Do you have a question about the Easy2Build Easy-Grow and is the answer not in the manual?
Questions and answers
need plastic v-shaped strips to hold greenhouse plastic into corners. I have a 6x10 Poly Greenhouse. According to manual it is part # 35 the v - locker