STC Easy2Build Easy-Grow Assembly Instructions Manual page 20

8’ x 10’ greenhouse
Hide thumbs Also See for Easy2Build Easy-Grow:
Table of Contents

Advertisement

Place door pro les L13D, L13F, L13G and L13H next to connectors S28 around
2.8B
Y26 panels as shown. Slide connectors into pro les. Make sure panels and
pro le L05F t into V-channels of each pro le.
L13G
S28
L13H
2.8C
Secure connectors with eight S02 screws.
L13G
L13H
2.8D
Slide hex nuts and bolts into
U-cutout in side of pro les L13F
and L13H. Tighten securely to hold in place.
Place S40 locks on pro les L13D and
2.9A
L13G as shown. Center the levers so
the screw holes are visible.
S40
L13G
L13H
S40
S40
L13G
IMPORTANT: Install door locks so levers face the panels.
Pro le
QTY
1
#L13F
www.stcny.com
S28
L13F
L05F
NOTE: ALL VIEWS ARE FROM INSIDE.
L13F
L13D
Pro le
Lock
QTY
1
#L13D
1
#L13G
#L13H
1
S28
L13F
2.9B
Secure each S40 lock with two S40A screws.
S40A
L13G
S40
L13D
NOTE: Door locks are shown in the UNLOCKED
positition. When door is installed in Step 15 and door
is closed, move lever to the left side to lock door.
Screw
QTY
#S40
2
4
#S40A
18 of 57
S28
S28
L13D
S02
L13D
S40A
L13D
Move lever to the right
2.9C
side to place lock in the
unlocked position.
L13G
L13D
Connector
QTY
#S28
8
#S02
QTY
4

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Easy2Build Easy-Grow and is the answer not in the manual?

Questions and answers

Robert S Antos
April 22, 2025

need plastic v-shaped strips to hold greenhouse plastic into corners. I have a 6x10 Poly Greenhouse. According to manual it is part # 35 the v - locker

Subscribe to Our Youtube Channel

Table of Contents