PTX1000 Installation Safety Guidelines

IN THIS SECTION

General Installation Safety Guidelines | 74

PTX1000 Chassis Lifting Guidelines | 74

Observe the following guidelines before and during PTX1000 installation:
General Installation Safety Guidelines
Before installing or moving the PTX1000, verify that the intended site meets the specified power,
environmental, and clearance requirements. See the following documentation:
PTX1000 Site Preparation Checklist on page 50
PTX1000 Clearance Requirements for Airflow and Hardware Maintenance on page 54
PTX1000 Rack Requirements on page 56
PTX1000 Environmental Requirements and Specifications on page 52
"PTX1000 AC Power Specifications" on page 44
PTX1000 Chassis Lifting Guidelines
The weight of a fully-loaded PTX1000 is approximately 68.6 lb (31.1 kg) with AC power supplies and 67.8
lb (30.8 kg) with DC power supplies installed. In addition to the guidelines described in
Component Lifting Guidelines" on page
PTX1000:
CAUTION:
remove the power supplies and fan modules before attempting to install the device.
Unless you are using a mechanical lift, at least three persons are required to perform
the rack installation.
Before lifting or moving the PTX1000, disconnect all external cables.
When manually raising the PTX1000 into the rack, have two persons lift and align the PTX1000 with
the rack while another person secures the device to the rack. As when lifting any heavy object, lift most
or
PTX1000 DC Power Specifications on page 46
136, observe the following guidelines for lifting and moving a
If you are installing the PTX1000 above 60 in. (152.4 cm) from the floor,