Ptx1000 Site Preparation Checklist - Juniper PTX1000 Hardware Manual

Packet transport router
Hide thumbs Also See for PTX1000:
Table of Contents

Advertisement

PTX1000 Site Preparation Checklist

The checklist in
Table 17 on page 50
a PTX1000 installation.
Table 17: Site Preparation Checklist
Item or Task
Environment
Verify that environmental
factors such as temperature
and humidity do not exceed
router tolerances.
Power
Measure the distance
between external power
sources and the router
installation site.
Calculate the power
consumption and
requirements.
Rack
Verify that your rack meets
the minimum requirements
for the installation of the
router.
Plan rack location, including
required space clearances.
Secure the rack to the floor
and building structure.
Cables
summarizes the tasks you need to perform when preparing a site for
For More Information
"PTX1000 Environmental Requirements and
Specifications" on page 52
PTX1000 AC Power Specifications on page 44
PTX1000 DC Power Specifications on page 46
"PTX1000 Rack Requirements" on page 56
"PTX1000 Clearance Requirements for Airflow
and Hardware Maintenance" on page 54
Performed by
Date