Unpacking; Installation Flowchart - Huawei NetCol5000-C Series User Manual

Simple configuration in-row chilled water smart cooling product
Hide thumbs Also See for NetCol5000-C Series:
Table of Contents

Advertisement

NetCol5000-C030 In-row Chilled Water Smart Cooling
Product
User Manual (Simple Configuration)

3.2 Unpacking

Procedure
Step 1 Inspect the outer packing for signs of damage. If any damage is found, contact the shipping
company immediately.
Step 2 Unpack the product.
1.
2.
Step 3 Check the type and quantity of fittings against the packing list. If fittings are missing or
inconsistent with those in the packing list, record the information and contact your local
Huawei office immediately.
----End

3.3 Installation Flowchart

Issue 09 (2020-01-10)
Remove the straps, top cover, outer packing, cushioning materials, and then plastic film,
as shown in
Figure
3-12.
Figure 3-12 Unpacking
Inspect the cabinet exterior for signs of collision or scratches. If any damage is found,
contact the shipping company immediately.
Copyright © Huawei Technologies Co., Ltd.
3 Installation
40

Advertisement

Table of Contents
loading

Table of Contents