Checking The Pressure - Huawei NetCol5000-C Series User Manual

Simple configuration in-row chilled water smart cooling product
Hide thumbs Also See for NetCol5000-C Series:
Table of Contents

Advertisement

NetCol5000-C030 In-row Chilled Water Smart Cooling
Product
User Manual (Simple Configuration)

3.4 Checking the Pressure

Context
The equipment has been charged 0.3-0.5 MPa nitrogen. Check the inner pressure to make sure
whether the system is leaking or not.
Procedure
Step 1 Open the rear door.
Step 2 Remove the air filters.
1.
2.
Step 3 Take out the desiccant bag in the inner side of the post in the lower right corner of the rear
door.
Step 4 Open the exhaust valve shown in
Issue 09 (2020-01-10)
Unfasten the eight rotating check plates in the upper and lower positions of the air filters.
Figure 3-14 Removing air filters
Pull out the air filters.
Copyright © Huawei Technologies Co., Ltd.
Figure 3-15
to exhaust gas through the leather hose.
3 Installation
42

Advertisement

Table of Contents
loading

Table of Contents