4.3 Power-on Commissioning

4.3.1 Quick Settings

Prerequisites
After the system is powered on, the LCD is started, and the progress bar in the startup screen
is full:
Procedure
Step 1 Set the language and tap Next, as shown by (1) in
Figure 4-3 Quick settings
Step 2 Set the time and date and tap Next, as shown by (2) in
Step 3 Set system parameters and tap Finish, as shown by (3) in
Step 4 The system displays a dialog box for confirming the rated voltage. Tap Yes after confirmation,
as shown by (4) in
----End

4.3.2 Initial Configuration

Issue 09 (2020-01-10)
For initial power-on, the system enters the quick setting screen. Set the parameters by
following the instructions in this section.
For non-initial power-on, the LCD automatically enters the home screen as shown in
Figure
4-1.
Figure
4-3.
Copyright © Huawei Technologies Co., Ltd.
Figure
4-3.
Figure
4-3.
Figure
4-3.
4 ACC Introduction
81

Advertisement

Table of Contents
loading

Table of Contents