5.1 Checking Before Power-On

Before power-on, clear dust, dirt, and foreign matter from the cabinet; otherwise, the water
pump may be blocked, resulting in drainage failure or serious equipment malfunction.
1.
2.

5.2 Powering On the NetCol5000-C

Prerequisites
The AC input switches on the primary power wiring panel are turned off.
Procedure
Step 1 After the main power supply is connected, use a multimeter to check whether the input
voltage is within the normal range.
range of the system.
Issue 09 (2020-01-10)
5
Ensure that the power supply meets the requirements on the product nameplate.
Ensure that power cables are correctly connected and securely bound.
Copyright © Huawei Technologies Co., Ltd.

Power-On Commissioning

2.5 Technical Specifications
5 Power-On Commissioning
shows the operating voltage