NetCol5000-C030 In-row Chilled Water Smart Cooling
Product
User Manual (Simple Configuration)
Procedure
Step 1 Hold the manual adjustment button and manually turn the chilled water valve to the maximum
scale (100%).
Figure 3-32 Adjusting the chilled water valve
Step 2 Connect a pressure gauge, reducing valve, and nitrogen cylinder to any one of the needle
valves. Inject 0.8 MPa (when the pressure is stable) nitrogen, and leave them for 24 hours.
Issue 09 (2020-01-10)
Copyright © Huawei Technologies Co., Ltd.
3 Installation
60