Installation: Task 3 — Installing the MAPD Assembly in
the Switch
7. As the MAPD system comes up, watch the Liquid Crystal Display (LCD) on
the faceplate (see Figure 2-7). The LCD identifies the MAPD states and
alarms.
the following states (in order):
When the MAPD system is coming up, the LCD should display
FWBOOT (firmware board tests)
PCBIOS (Pentium processor card diagnostics)
OSINIT (operating system initialization)
PGMFW (update MAPD FLASH PROMS, if necessary)
AINIT (MAPD System Initialization)
NOTE:
If the system does not come up to the AINIT state within 10
minutes (4 to 7 minutes is average), contact the Technical
Service Center (TSC) for assistance.
ASAI x (MAPD running with x established ASAI links)
Issue 3 May 2002
2-21
Need help?
Do you have a question about the DEFINITY and is the answer not in the manual?
Questions and answers