Komatsu PC400LC-5 Operation & Maintenance Manual page 92

Hydraulic excavator
Table of Contents

Advertisement

3.
4.
5.
Set the safety lock lever @ to the FREE position,
and raise the
bucket from the ground.
Operate
bucket control
lever @ and arm control lever @ slowly
to move the bucket cylinder
and arm cylinder
to the end of the
stroke.
Carry out bucket and arm operation
for 5 minutes
at full stroke,
alternating
between
bucket operation
and arm operation
at 30
second intervals.
If the
swing
lock switch @ is set to the ON (actuated)
position and
swing control lever @ is operated
at full stroke, oil temperature-
rise can be increased
earlier.
NOTICE
When the work
equipment
is retracted,
take care that it does
not interfere
with the machine
body or ground.
After carrying
out the warming-up
operation,
check that each
gauge and monitor
lamp is in the following
condition.
Engine water temperature
gauge 0:
Inside green
range
Fuel gauge 0:
Inside green range
Engine water temperature
monitor
@:
OUT
Radiator
water
level monitor
@:
OUT
Engine oil pressure
monitor
0:
OUT
Charge
level monitor
0:
OUT
Fuel level monitor
0:
OUT
Engine pre-heating
lamp @:
OUT
Engine oil level monitor
0:
OUT
Hydraulic
oil level monitor
@:
OUT
Check that there
is no abnormal
exhaust'gas
color,
noise, or
vibration.
If any abnormality
is found,
repair it.
AE097640
Forward of
the machine
2-46

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pc400Pc400-5 mightyPc400hd-5

Table of Contents