Komatsu PC400LC-5 Operation & Maintenance Manual page 185

Hydraulic excavator
Table of Contents

Advertisement

24.
SERVICE PROCEDURE
24.2.8 ADJUST
BUCKET CLEARANCE
a
WARNING
It is dangerous
if the work
equipment
moves
by mistake
when
the clearance
is being adjusted.
Set the work
equipment
in a stable
condition,
then
stop the
engine
and lock the lever securely.
Free
AE096630
1.
2.
3.
4.
Set the work equipment
to the position shown in the diagram
at
right,
stop the
engine
and
set the
lock lever
to the
locked
position.
Measure
the amount
of play "a".
Measurement
is easier of you move the bucket to one side or the
other so all the play can be measured
in one place.
Use a gap (clearance)
gauge
for easy and accurate
measure-
ment.
Loosen the four bolts, bolt @ and plate 0.
Remove
shim
@ corresponding
to the
amount
of play
"a"
measured
above.
[Example]
In the case of play of 3 mm, remove two 1.0 mm shims and one 0.5
mm shim. Play becomes
0.5 mm. For shim 0, two types of 1.0 mm
and 0.5 mm are used.
When
play
a is smaller
than
one
shim,
do not carry
out
any
maintenance.
5.
Tighten
the four bolts @ and 0.
Then, clearance
"b" becomes
large and free play "a" is removed.
3-41

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pc400Pc400-5 mightyPc400hd-5

Table of Contents