Komatsu PC400LC-5 Operation & Maintenance Manual page 203

Hydraulic excavator
Table of Contents

Advertisement

24. SERVICE PROCEDURE
8.
After replacing the filter cartridge,
start the engine and check that
there is no leakage of fuel from the filter seal surface.
If there is
any leakage
of fuel, check the tightening
of the filter cartridge.
Whenever
there
is leakage
of fuel,
follow
Steps
1 and 2 to
remove
the filter cartridge,
then check the packing
surface for
damage
or foreign
material.
If any damage
or foreign
material
is found in the packing, replace the packing with a new part, then
repeat Steps 3 - 6 to install the filter cartridge.
NOTICE
When
the
engine
has run out
of fuel,
carry
out the
same
procedure
and crank the engine
for 15 - 20 seconds.
Repeat
this operation
2 - 3 times
to bleed the air.
Do not rotate the starting
motor continuously
for more than 20
seconds.
Wait for 1 - 2 minutes
before
rotating
again.
The time taken to bleed the air is shorter when the fuel tank is full.
3-59

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pc400Pc400-5 mightyPc400hd-5

Table of Contents