Komatsu PC400LC-5 Operation & Maintenance Manual page 167

Hydraulic excavator
Table of Contents

Advertisement

23. MAINTENANCE
SCHEDULE CHART
23.1
MAINTENANCE
SCHEDULE
CHART
SERVICE
ITEM
INITIAL
250 HOURS
SERVICE
(only after the first 250 hours)
Replace fuel filter cartridge
PAGE
3-26
Check engine
valve clearance,
adjust
3-26
WHEN
REQUIRED
Check, clean and replace
air cleaner
element
3-27
Clean inside of cooling
system
3-29
Check and tighten
track shoe bolts
3-33
Check and adjust track tension
3-34
Check electrical
intake air heater
3-36
Replace
bucket teeth (vertical
pin type)
3-37
Replace
bucket teeth (horizontal
pin type)
3-40
Adjust
bucket clearance
3-41
Clean line filter
3-42
Drain water from water
separator
3-42
CHECK BEFORE STARTING
Check coolant
level, add water
Check oil level in engine
oil pan, add oil
3-43
3-43
Check fuel level, add fuel
3-44
Check oil level in hydraulic
tank, add oil
3-45
Check dust indicator
3-46
Check electric wirings
3-46'
Lubricate
clamshell
bucket (12 points)
3-47
Check for water
and sediment
in water
separator,
drain water
3-47
EVERY 100 HOURS
SERVICE
Lubricating
l
Boom cylinder
foot pin (2 points)
3-48
3-48
3-23

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pc400Pc400-5 mightyPc400hd-5

Table of Contents