Siemens LMV5 Series Technical Instructions page 211

Linkageless burner management system
Hide thumbs Also See for LMV5 Series:
Table of Contents

Advertisement

LMV Series 
 
 
CANbus Faults Including "AZL not on Bus" and "System Test" (continued) 
The most common CANbus errors are: 
 
 "AZL not on Bus" 
 Stuck in "System Test" 
 Error code 99 
 Error code A7, diagnostic 17 
 
However, there are many additional error codes that can also be caused by an issue with the 
CANbus network.  The following procedure can be used to diagnose any CANbus related error: 
 
1. Take the cover off of the last actuator (or PLL52 O
to terminal X51 on the LMV5.  This should have only one 5‐pin green connector plugged into 
it. The other CANbus terminals should be empty, and is a perfect place to measure voltage.  
Ensure that the following voltages are present on the pins of the empty CANbus terminal: 
 
 12 VAC between pins 12VAC1 and GND 
 12 VAC between pins 12VAC2 and GND 
 24 VAC between pins 12VAC1 and 12VAC2 
 
When measuring to ground (GND), it is ok to have anywhere from 10.2‐13.2 VAC as long as 
both measurements are the same.  For example, it is okay to have 11 VAC between pins 
12VAC1 and GND as long as there is also 11 VAC between pins 12VAC2 and GND.  In 
addition, the voltage between pins 12VAC1 and 12VAC2 must be exactly double the other 
two measurements.  If these three voltage measurements are correct, skip to step 3. 
 
2. If one or more of the voltage measurements is incorrect, check the following: 
 
 CANbus fuses FU2 and FU3 are located on the right hand side of the LMV5. Check 
that these fuses are not blown. If either one is blown, check the LMV5 wiring for 
incorrect terminations.  Once any wiring errors have been fixed, replace the blown 
fuse. 
 The most common wiring error has to do with pins 3 and 4 on transformer terminal 
SEK2.  Pin 3 on terminal SEK2 should be wired to terminal X52, pin 4 on the LMV5.  
Pin 4 on terminal SEK2 should be wired to terminal X52, pin 3 on the LMV5. 
 Make sure pin 3 on terminal SEK2 of the transformer is grounded properly. 
 Make sure the rest of the CANbus network is wired properly.  See Section 2 for 
additional wiring assistance. 
 
 
SCC Inc. 
 
 
 
 module) on the CANbus network wired 
2
Page 3 
HOME
Technical Instructions 
Document No. LV5‐1000 
Section 7 

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lmv51.140c1Lmv51.040c1Lmv52.240b1Lmv52.440b1

Table of Contents