Siemens LMV5 Series Technical Instructions page 213

Linkageless burner management system
Hide thumbs Also See for LMV5 Series:
Table of Contents

Advertisement

LMV Series 
 
 
CANbus Faults Including "AZL not on Bus" and "System Test" (continued) 
 
 Make sure the shielding of the CANbus cable is grounded properly.  The shielding of 
the CANbus cable is immediately under the plastic sheathing and encircles all five 
conductors.  The shielding on all segments of the CANbus cable must have continuity 
with terminal X51.1.  This can be checked with a multi‐meter by connecting one 
probe on the AGG5.110 shielding clip attached to terminal X51.1, and the other 
probe on the last actuator (or O
 
 If everything else checks out, and every time one of the actuators is plugged in it 
immediately causes a CANbus fault, replace the appropriate actuator. 
 
 
 
 
 
 
 
SCC Inc. 
 
 
 module) on the CANbus network. 
2
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Page 5 
HOME
Technical Instructions 
Document No. LV5‐1000 
Section 7 

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lmv51.140c1Lmv51.040c1Lmv52.240b1Lmv52.440b1

Table of Contents