Completing The Engine - Iveco VECTOR Series Technical And Repair Manual

Industrial application
Table of Contents

Advertisement

VECTOR 8 ENGINES

COMPLETING THE ENGINE

Figure 69
- From the front, fit the engine oil filter support (1)
together with the temperature transmitter (2), pressure
sensor (5), the gasket (4) and the filter clog sensor (3).
- Tighten the M8x1.25 fixing screws to a torque of 22—27
Nm.
Figure 70
- Fit the exhaust manifolds (2) tightening the screws (1)
M10x1.5 in two phases:
A: torque
47÷53Nm
B: pre—torque
47÷53 Nm
torque
64÷70 Nm
Figure 71
Print P2D32V001E
NOTE
Before tightening the screws (see order in
Figure 71), lubricate them with graphitized oil.
Always fit new gaskets.
NOTE
Figure 72
82216
NOTE
Wash and grease the shaft of the pump before
mounting the gear.
- Assemble gear (1) with tool 99368517; tighten the fixing
nut to 350 torque (300 Nm with the screwdriver with
final take off at 350 Nm with dynamometric wrench).
82215
- Fit the high—pressure fuel pump together with its driving
gear and seals.
- Tighten the M10x1.5 fixing screws to a torque of 49—60
Nm.
NOTE
Before tightening, lubricate the screws with UTDM
oil or alternatively with engine oil.
- Fit the intake manifolds together with new gaskets on the
heads.
- Tighten the M10x1.25 screws to a torque of 38—45 Nm.
- Fit the diesel supply pipe to the high—pressure pump.
Piping M18x1.5 tighten on the coupling to a torque of
50 Nm.
- Fit the water—oil cooler after changing the two O—rings.
- Tighten the 6 M10x1.5x40 mm screws to a torque of
25—30 Nm.
89802
SECTION 3 - INDUSTRIAL APPLICATION
33
82258
Base - April 2006

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vector 8

Table of Contents