Iveco VECTOR Series Technical And Repair Manual page 68

Industrial application
Table of Contents

Advertisement

16
SECTION 3 - INDUSTRIAL APPLICATION
For G-DRIVE, DRAGON and GRIFFON applications
Figure 18
- Remove the bracket (1) for the flywheel and intercooler
casing (2).
- Undo the nuts fixing the turbocharger (3) to the exhaust
manifold.
- Then
repeat
this
procedure
turbo—blower.
Base - April 2006
For SPRINKLER applications
- Remove the manifold (1) between the turbo—blower (2)
103231
- Remove the exhaust pipe (5) between the waste gate
- Remove the air pipe (6) between the turbo—blower and
- Lastly, unscrew the nuts fixing the turbo—blower to the
for
the second
- Then remove the cooling pipes of the waste gate valve
- Then
For all applications
- Disassemble the junction plate (3) of the cooling pipes
- Then disassemble the cooling pipes (1), the three way
Figure 19
and the intercooler (3), loosening the clamp (4) on the
manifold and on the turbo—blower .
valve (7) and the pipe of the turbo—blower.
the waste gate valve (7).
exhaust manifold.
(7) and detach it from the exhaust manifold.
repeat
this
procedure
turbo—blower.
Figure 20
(1) and the three way fitting on the exchanger.
fittings by loosening the screws (2) and the fitting on the
inlet of the main bearings.
VECTOR 8 ENGINES
83499
for
the second
89793
Print P2D32V001E