Iveco VECTOR Series Technical And Repair Manual page 177

Industrial application
Table of Contents

Advertisement

VECTOR 8 ENGINES
Method 2 (using equipment)
Figure 48
Position cylinders 1 and 6 at TDC.
Fit tool 99368509 (3) on the front casing.Secure it using the
bolts (2, 5).
At TDC the pins (2) and (3) for the tool engage in the dowels
for the crankshaft and the camshaft respectively guaranteeing
the timing.
Flywheel timing
Figure 49
With tool 99368509 (3, Figure 48) fitted, fit the two timing
gears (6) and the spacer (5) and secure the assembly using the
bolts (4).
Fit the tool (1) 99368508 on the front casing as shown in the
diagram.
Fit the flywheel (2) so that the tool 99368508 is inserted, via
the seat for the timing sensor, on the tooth on the flywheel
(see arrow).
Proceed with tightening the bolts (3).
Print P2D32V001E
SECTION 4 - OVERHAUL AND TECHNICAL SPECIFICATIONS
113064
113065
27
Base - April 2006

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vector 8

Table of Contents