Iveco VECTOR Series Technical And Repair Manual page 69

Industrial application
Table of Contents

Advertisement

VECTOR 8 ENGINES
Figure 21
- Proceed as follows:
Undo the screws of the collars (1) securing the pipes (2)
to the intake ducts.
Undo bolts (3) securing fastening collars (9) that join
pipes (2) to fittings (4) on the engine blocks by means
of gaiters (10).
Undo the screws (5) fixing the couplings (4) on the main
bearings and at the top unscrew the screws (6) fixing the
three—way coupling (7) on the oil/water cooler (8) of the
engine oil.
Print P2D32V001E
SECTION 3 - INDUSTRIAL APPLICATION
Figure 22
- Unscrew the 10 screws (1) fastening the intercooler to
the air intake manifolds.
17
114242
82212
Base - April 2006

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vector 8

Table of Contents