Replace equipment as necessary.
Verification
To verify that the CS 1000E is operating properly and there are no remaining
faults, follow the steps in Procedure 4.
Procedure 4
Verifying operation
1
Ensure all LEDs on the alarm/fan module are green.
2
Make sure all circuit cards that could have been removed are reinserted
in their assigned location and enabled.
3
Ensure the system utility card has the correct DIP switch settings for
CPU 0 or CPU 1 as required. Also ensure that the enable/disable switch
is set to enable.
4
Make sure all wiring and connectors that could have been disconnected
are reconnected.
5
Set the midnight routine to run after logging out of the system by entering:
LD 135
MIDN
End the session in LD 135 and log out of the system by entering:
**** (four asterisks)
LOGO
The midnight routine will now run.
6
Check system messages produced when the midnight routine runs. Clear
any faults indicated.
Clearing faults
End of Procedure