System Operation; Switch On - Alpha ESS Storion-SMILE5 Installation Manual

Energy storage system
Table of Contents

Advertisement

System Operation

3.1 Switch on

System shall be turned on in the correct sequence to avoid any damage.
Step 1: Open cable box outer shell.
___________________________________________________________________
Step 2: Unlock then open Cable box
inner cover. Cable box locker can be
opened without tools.
Step 3: Turn on the PV switch on the
cable box.
Step 4: Turn on the GR switch.
Step 5: If backup load is applied, con-
nect it to Backup ports and turn on the
Backup switch; if not, then keep the
Backup switch off.
NOTE: the Backup switch is only
used when a backup load is applied.
Alpha ESS Co., Ltd.
Your Smart Energy
Page 27 of 40

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents