System Operation; Switch On - Alpha ESS SMILE5 Installation, Operation & Maintenance Manual

Energy storage system
Table of Contents

Advertisement

39
0 0 0 1
FN
Set
Step 3: Enter the password "0001" and
confirm the entry by pressing the Enter
key.
ADDR
BAUD
MODE
645000000000000
FN
Step 5: Set the communication address and communication baud rate in the
communication setting interface. When the meter is used as Grid meter (DC, AC/Hybrid
system), the address is set to "005" . When it is used as the PV meter (AC/Hybrid
system), the address is set to "006" . The baud rate is set to 9600.
INTRODUCTION
Config
AOUT
Comm
Timer
Tarriof
Others
DOUT
Version
FN
Set
Step 4: Select the menu item "Comm" in
the settings menu to change to the
communication settings.
005
9600
NONE
Set

SYSTEM OPERATION

03
SYSTEM OPERATION

3.1 Switch On

When turning on the system, it is very important to follow the steps below to prevent
damage to the system.
WARNING: Please check the installation again before turning on the system.
Step 1:
Turn on the external PV switch
Step 2:
Turn on the external grid switch.
Step 3:
If backup load is applied, turn on the external Backup switch.
NOTE:
the Backup switch is only used when a backup load is applied.
Step 4:
Open the outer shell of the cable box. Open the battery switch cover and turn on
the battery switch on the cable box.
Step 5:
Press power button on all the batteries until the indicator lights turn on.
Step 6:
Close the battery switch cover and the outer shell of the cable box.