4. Operation- Switch On/Off

4.1 Switch on
System shall be turned on in the correct sequence to avoid any damage.
Pic 3. Start Sequence (PV, Grid, AC OUT)
Note: The Grid switch is only used when a generator is applied.
Pic 4. Turn on battery switch
(cable box or super cable box)
4.2 Switch off
2
1
Pic 5. Start the battery
1
2
3
Pic 2. Storion OF5 Delivery Scope
Step 1 Turn on the PV switch on the cable box.
Step 2 If generator is applied, connect it to Grid
ports and turn on the GRID switch; if not, then
keep the GRID switch off.
Step 3 Turn on the AC switch.
Step 4 Turn on the Battery switch.
Step 5 Press button 1 on all the batteries, and
the indicator light 2 will be on.
Step 1 Press button 1 on all the batteries, till the lights
off.
Step 2 Turn off the Battery switch.
Step 3 Turn off the AC switch.
Step 4 If generator is applied, turn off the GRID switch.
Step 5 Turn off the PV switch on the super cable box.