4 Safety instructions

4
Safety instructions
Only properly qualified personnel are permitted to perform activities such as
transport, installation, commissioning and maintenance. Properly qualified
persons are those who are familiar with the transport, assembly, installation,
commissioning and operation of the product, and who have the appropriate
qualifications for their job. The qualified personnel must know and observe:
IEC 364 and CENELEC HD 384 or DIN VDE 0100
IEC-Report 664 or DIN VDE 0110
National Accident Prevention Regulations or BGV A2
Read this documentation before carrying out installation and commissioning.
Incorrect handling of the PMCprimo Drive can lead to personal injury or material
damage. It is vital that you keep to the technical data and information on
connection requirements (on the nameplate and in the documentation).
The PMCprimo Drive2 contains electrostatically sensitive components which may
be damaged by incorrect handling. Discharge your body before touching the
PMCprimo Drive2. Avoid contact with highly insulating materials (synthetic fibre,
plastic film etc.). Place the PMCprimo Drive2 on a conductive surface.
Do not open the units. Keep all covers and switchgear cabinet doors closed during
operation. Otherwise there are deadly hazards, with the possibility of severe
danger to health or material damage.
During operation, PMCprimo Drives, according to their degree of enclosure
protection, may have uncovered live components. Control and power connections
may be live, even if the motor is not rotating.
PMCprimo Drives may have hot surfaces during operation. Since the front panel is
used for cooling, it can reach temperatures above 80°C.
Never undo the electrical connections to the PMCprimo Drive2 while it is live. There
is a danger of electric arcing with damage to contacts and danger to persons.
Wait at least five minutes after disconnecting the PMCprimo Drive2 from the mains
supply voltage before touching live sections of the equipment (e.g. contacts) or
undoing connections. Capacitors can still have dangerous voltages present up to
five minutes after switching off the supply voltages. To be sure, measure the
voltage in the DC-link circuit and wait until it has fallen below 40V.
Based on the guideline 94/9/EC (ATEX guideline) this product is not suitable for the
application in potential explosive areas without evaluation of the conformity.
Installation manual PMCprimo Drive2
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
Page 7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents