8 Installation
-
8.4

Wiring

Only professional staff who are qualified in electrical engineering are allowed to install the
PMCprimo Drive2.
The installation procedure is described as an example. A different procedure may be sensible or
necessary, depending on the application of the equipment.
Caution !
Only install and wire up the equipment when it is not live, i.e. when neither the mains
power supply nor the 24 V auxiliary voltage nor the operating voltages of any other
connected equipment is switched on.
Take care that the cabinet is safely disconnected (with a lock-out, warning signs etc.).
The individual voltages will be switched on for the first time during commissioning.
Note !
The ground symbol
you must take care to provide an electrically conductive connection with the largest
possible area between the unit indicated and the mounting plate in the switchgear cabinet.
This connection is for the effective grounding of HF interference, and must not be confused
with the PE- symbol
Use the following connection diagrams:
-
-
-
-
-
-
-
-
-
-
-
-
Installation manual PMCprimo Drive2
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
, which you will find in all the wiring diagrams, indicates that
(a protective measure to EN 60204).
Power and control connections:
Encoder emulation SSI:
RS232 / PC:
Power supply:
Master encoder:
Panel/Profibus:
CAN bus:
page 37
page 52
page 53
page 54
page 55
page 56
page 45
page 59
page 65
page 69
page 74
page 67
Page 35

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents