Electrical Installation - Landoll 2511 IN-3-30 2511 N-4-30 2511 N-5-30 Operator's Manual

In-row ripper
Table of Contents

Advertisement

ASSEMBLY INSTRUCTIONS

Electrical Installation

1. Attach left and right (Amber) Light Mount Brackets to
frame.
(See Figures 3-11
4 Shank: using 3-4-10 x 2 bolts and 3/4-10 lock
nuts.
Rigid 5,6,7,8 Shank: using 3/8-16 x 1-1/4 bolts and
3/8-16 lock nuts.
Folding: using 1/2-13 x 1-1/2 bolts and 1/2-13 lock
nuts
2. Attach Light Mount Reflector Bracket and Ag Amber
Lamps (LED) to light brackets using 1/4-20 x 1-1/2
bolts and 1/4-20 lock nuts.
3. Attach Bracket Holder and Light Mount Reflector
Bracket to the front of the frame.
4. Attach (Red) Warning Lamp Brackets to frame using
1/2-13 x 1-1/2 bolt and 1/2-13 lock nuts. Install Ag
Red Lamps (LED) to brackets using 1/4-20 x 1-1/2
bolts and 1/4-20 lock nuts.
5. Attach Ag Flasher Control Module to frame using
1/4-20 x 2 bolts, 1/4W flat washers and 1/4-20 lock
nuts. Be sure that the control module is set so that
the 4-Pin Connector faces the right side of the
machine.
IMPORTANT
Make sure lights are positioned for maximum
visibility from the rear.
1. Install the LED Warning Light Harness to the frame.
Connect 2-Pin and 3-Pin ends to each of the warning
lights. Connect 6-Pin to the Ag Flasher Control
Module.
2. Attach 7-Pin/4-Pin 120" harness to frame. Connect
4-Pin end to the Ag Flasher Control Module.
3. Ensure that the harnesses are clear of any moving
parts and secure the harnesses with tie wraps
provided.
4. Install the Stor-away holder bracket on bolt in coulter
clamp plate and assemble harness Stor-away to
bracket with 1/4-20 x 3/4 hex head cap screws and
hex lock nuts.
3-12
TABLE OF CONTENTS
thru 3-12.)
F-1040-0123

Advertisement

Table of Contents
loading

Table of Contents