IBM 3746-900 Installation And Maintenance Manual page 48

Service processor (based on 6578)
Table of Contents

Advertisement

Table 1-3. Telecom. cables
Country
PN
Austria
89G2544
Belgium
89G2545
Bolivia
89G2554
Brazil
89G2554
Bulgaria
89G2554
Canada
89G2562
China
89G2554
Colombia
89G2554
Costa Rica
89G2554
Croatia
89G2554
Cyprus
89G2577
Czech Republic
89G2554
Denmark
89G2546
Egypt
89G2554
El Salvador
89G2554
Ecuador
89G2554
Finland
89G2547
France
89G2548
Installation procedure: Figure 1-25 shows the modem rear panel with the
connectors where the DTE and line cables must be connected:
Figure 1-25. 7857 Rear Panel
Step
Step
Step
1-28
3745-XXA 1-28 3746-9X0: 6578 SPIM
Table 1-3. Telecom. cables
Country
Germany
Greece
Guatemala
Honduras
Hong Kong
Hungary
Iceland
Ireland
Israel
Italy
Japan
Korea
Kuwait
Luxembourg
Macedonia
Mexico
Netherlands
New Zealand
Norway
Pakistan
Panama
1. Be sure that the power switch located on the modem rear panel is off.
2. If you are going to use a switched line telecommunication cable, plug it
into the PSTN socket located on the modem rear panel, with the ferrite
cylinder at the modem side. If this modem is not being installed in the
United Kingdom, connect the other end of the cable to the
telecommunication line.
3. If you plan to use a leased line telecommunication cable, plug it into the
LL jack located on the modem rear panel, with the ferrite cylinder at the
Table 1-3. Telecom. cables
PN
Country
89G2549
Paraguay
89G2554
Peru
89G2554
Poland
89G2554
Portugal
89G2565
Romania
89G2554
Russia
89G3145
Saudi Arabia
89G2554
Slovakia
89G3131
Slovenia
89G2551
South Africa
89G2562
Spain
89G2554
Sweden
89G2554
Switzerland
89G3134
Taiwan
89G2554
Thailand
89G2554
Turkey
89G2552
U.K.
89G2577
Ukraine
89G2553
Uruguay
89G2554
U.S.
89G2554
Venezuela
PN
89G2554
89G2554
89G2554
89G2554
89G2554
89G2554
89G2554
89G2554
89G2554
89G3135
89G2554
89G2555
89G2556
89G2554
89G2554
89G2554
89G2577
89G2554
89G2554
89G2562
89G2554

Advertisement

Table of Contents
loading

Table of Contents