Led's For Program Run And Error Display; Address Selector Switch S1; Real-Time Clock - KEB COMBIVERT P6 Instruction Manual

Hide thumbs Also See for COMBIVERT P6:
Table of Contents

Advertisement

Control circuit
4.3.2

LED's for program run and error display

Description
LD1 Fieldbus status
off
flashing 2.5 Hz
on
LD2 PLC Error
off
on
fast flashing
LD3 PLC Run
off
on
LD4 Inverter status
off
on
flashing (1 Hz)
Table 4:
4.3.3

Address selector switch S1

The function is defined in the customer PLC program.
4.3.4

Real-time clock

The installed clock is maintenance-free (no battery) and runs without voltage supply for about
30 days. Then it must be set again. A readable parameter displays the validity of the date
and time. For complete charging the control shall remain switched on for at least 30 minutes.
Leap years are automatically recognized until 2099. Date and time can be read and set via
COMBIVIS or the control program (library "SysTime").
32
Function
Fieldbus driver is not activated in the PLC program;
PLC program stopped or not available;
another fieldbus interface than CAN assembled
CAN node status = pre-operational
CAN node status = operational
Program OK or PLC program not available
Program error, exact error cause can be determined via COMBIVIS.
This LED can also be controlled customer-specific by the PLC pro-
gram.
Hardware error, PLC must be restarted
PLC program stopped or not available, fieldbus interface other than
CAN equipped
PLC program in run mode
Inverter part defective or no program
OK (24 V control voltage available)
Error in inverter part. Exact error cause can be determined via COM-
BIVIS.
Function of the LED's LD1...LD4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents