Setting up
Inserting hinges
Hinges are inserted using the 6-spindle interchangeable drilling unit.
Carry out a function test before commencing production.
With frame hinged down, actuate safety switch to deactivate
motor while inserting hinge.
• Move panel
against stop
1
• Press foot switch or pushbutton
• Hold-down clamps
lock panel in place, and drilling takes place
2
• Hold-down clamps remain activated and continue to hold
panel in place
• Fit a hinge into insertion die
• Using grip
, move press in frame
5
• Press foot switch (pushbutton) again (One hand on press in frame,
one hand on pushbutton.)
• The hinge is pressed into place
NOTE
Connecting fittings are pressed in in the same way.
• Press pushbutton
5
• Hold-down clamps are raised and you can remove panel
This concludes the work operation
2. Preparing for work
WARNING
Hand injuries!
Before resetting the machine, disconnect mains plug
and detach compressed air supply.
First select the appropriate interchangeable drilling unit.
The machine comes in 4 versions.
Tools used (drill bits).
First install the drill bits required. This setting applies
to all interchangeable drilling units.
Insert required drill bit
1
and tighten the two screws
When fitting, make sure drill bit chucking face
is correctly positioned. The screws must clamp the bit
in position at this face.
42
3
4
under drilling unit
6
into bayonet chuck
2
using Allen key
.
7
3
8
3
1
Fig. 32: Pressing in hinges
2
Fig 33: Hinge in insertion die
Fig. 34: Swinging round
press in frame
7
8
Fig. 35: Tools used (drill bits)
Need help?