6. How to Install
NB!
All cable lugs/ shoes must mount within the width of the terminal bus bar
Terminal locations
(D enclosures)
Take the following position of the terminals into consideration when you design for cables access.
6
Illustration 6.4: Position of power connections, D3/ D4 enclosure
Illustration 6.5: Position of power connections with disconnect switch, D1/ D2 enclosure
Be aware that the power cables are heavy and hard to bend. Consider the optimum position of the frequency converter for ensuring easy installation of
the cables.
98
MG.33.BA.02 - VLT
®
is a registered Danfoss trademark
FC 300 Design Guide