8. Options and Accessories
•
Cable strips for fastening cables to relay module
The relay option does not support FC 302 frequency converters manufactured before week 50/2004.
Min. software version: 2.03 (par. 15-43).
1)
IMPORTANT! The label MUST be placed on the LCP frame as shown (UL approved).
8
Warning Dual supply
How to add the MCB 105 option:
•
The power to the frequency converter must be disconnected.
•
The power to the live part connections on relay terminals must be disconnected.
•
Remove the LCP, the terminal cover and the LCP fixture from the FC 30x.
•
Fit the MCB 105 option in slot B.
•
Connect the control cables and fasten the cables with the enclosed cable strips.
•
Make sure the length of the stripped wire is correct (see the following drawing).
•
Do not mix live parts (high voltage) with control signals (PELV).
•
Fit the enlarged LCP fixture and enlarged terminal cover.
•
Replace the LCP.
•
Connect power to the frequency converter.
•
Select the relay functions in par. 5-40 [6-8], 5-41 [6-8] and 5-42 [6-8].
NB!
Array [6] is relay 7, array [7] is relay 8, and array [8] is relay 9