1.1.1
Rough procedure
The following shows the procedures before operating a GOT and the descriptions of each item.
Install GT Designer3 in a personal computer.
Create project data.
Wire for the GOT power supply and the controller.
Wire for the controller power supply and I/O.
Turn on the power of the GOT and controller.
Install the OS to the GOT.
Check that the OS is installed to the GOT.
Download project data.
Turn on the controller power and check that the GOT
recognizes the controller.
Check that the monitoring is normal.
➠
Refer to the setting method of GT Works3.
➠
Refer to GS21 GOT General Description.
➠
Refer to GT Designer3 (GOT2000) Help.
➠
7. WIRING
➠
Refer to GOT2000 Series Connection Manual for GT Works3
Version1.
➠
Controller manuals
➠
Refer to GT Designer3 (GOT2000) Help.
➠
Refer to GT Designer3 (GOT2000) Help.
1 - 3