You have now done your part in creating this sample project. It is now time for EZware-500 to do its part.

Fin ishing Up

There are still a few steps, which must be completed before you can test your first project. In this section, you will:
save the project onto your computer hard drive
compile the project into a format that can be understood by the OIT
download the project to the OIT
verify that the OIT operates as expected
exit the EZware-500 software
Saving your first project
1. From the File menu, click Save As. The Save As dialog box appears.
2. In the File name text box, type EBPrj1.
3. Click Save. The file is saved onto your computer hard drive and the main screen of
EasyBuilder reappears.
Compiling your first project
1. From the Tools menu, click Compile. The Compiling dialog box appears.
2. Click Compile. EasyBuilder will compile your project and display error results.
3. If no errors occur, click Close. The main screen of EasyBuilder reappears. If errors have
occurred, repeat the steps in the Creating a Sample Project section.
Downloading your first project
1. Apply power to your OIT.
2. From the Tools menu, click Download. The EasyDownload Complete Project dialog box
appears.
3. If the OIT is correctly connected to the computer, then the download process will begin. You
will notice that a horizontal bar graph is displayed on the computer indicating how much of
the project has been downloaded. The OIT will also display several Write Flash commands
that scroll on the screen. If a timeout error is displayed, please review your connection of the
OIT to the computer and make sure that the appropriate settings in EasyManager are used.
4. After the download is finished, the Mission Complete dialog box is displayed.
5. Click OK. The main screen of EasyBuilder reappears.
6. You will now use EasyManager to get the OIT to execute the project you just downloaded. If
you want to exit EasyBuilder, from the File menu click Exit.
Displaying your project on the OIT
1. From the Windows Task Bar, click EasyManager. The EasyManager dialog box appears.
2. Click Jump To Application. This will send a command to the OIT to run the project.
1010-1001a, Rev 02
If you haven't already done so, now would be a good time to connect the OIT to the
computer and to connect the PLC that you are using to the OIT. For more information,
consult the first part of this chapter or see "Installation of OITs" later on in this
manual.