Daikin VRV Inverter K Series Manual page 309

Table of Contents

Advertisement

SI-05C.BOOK Page 295 Monday, November 6, 2000 4:13 PM
SiE-05C
1.10 Demand Control
By connecting the external contact input to the demand input of the outdoor unit external control adaptor
(option), the compressor operating conditions can be controlled for reduced power consumption.
Instructions for
1. Outdoor unit field setting
Demand Control
Operation
2. Outdoor unit external control adaptor setting
Set to "BOTH" or "DE."
Match with outdoor unit low noise operation and demand control address.
3. Select one from demand input terminals 1 through 3 on the outdoor unit external control
Demand Control
System Example
Test Operation PLUS Series
Demand 1 Approximately 70% level
Demand 2 Approximately 40% level
Demand 3 Forced thermostat OFF
Setting mode 1: Set low noise operation to "ON."
Setting mode 2: Match low noise operation and demand control address with address of outdoor unit
external control adaptor.
Function switch (SS1)
Address setting switches (DS1, DS2)
adaptor, and short the corresponding terminals.
Demand 1 Short 1-C.
Demand 2 Short 2-C.
Demand 3 Short 3-C.
: http://splitoff.ru/tehn-doc.html
Test Operation
295

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rsx5kRsx8kRsx10kVrv plus seriesRsxy5kRsxy10k ... Show all

Table of Contents