SI-05C.BOOK Page 273 Monday, November 6, 2000 4:13 PM
SiE-05C
1.1.3
Check Operation.
Carry out wiring check operation,
and check wiring and piping connections.
Set the operation mode to "cool."
Set to the test operation mode
and operate using the remote controller.
Normal operation
Refer to Wiring Check Operation on P296
Test Operation PLUS Series
For wiring check operation procedure, see wiring check
operation.
Even if it's the heating season, set to cooling mode in
order to prevent liquid from backing up. You may
however run the unit in the heating mode if the outdoor
temperature is -5 C or lower.
To enter the test operation mode, push the inspection /
test operation button of the indoor unit remote
controller 4 times. Push once more to return to the
normal operation mode.
•Make sure cold air (or warm air) is coming from the
indoor unit.
•Run the indoor units one at a time, and make sure
that the corresponding outdoor units also run.
: http://splitoff.ru/tehn-doc.html
Test Operation
(VF130)
273