YASKAWA iQpump1000 Installation & Start?Up Manual page 73

Intelligent pump controller
Hide thumbs Also See for iQpump1000:
Table of Contents

Advertisement

i.5 Start-Up Programming and Operation
• The motor should accelerate and decelerate smoothly.
n
Operating the Motor under Loaded Conditions
Test run the application similarly to the no-load test procedure when connecting the machinery to the motor.
• Monitor U1-03 for overcurrent during operation.
• If the application permits running the load in the reverse direction, change the motor direction and the frequency reference
while watching for abnormal motor oscillation or vibration.
• Correct any problems that occur with hunting, oscillation, and other control-related issues.
YASKAWA TOEP YAIP1W 02E YASKAWA AC Drive - iQpump1000 Installation & Start-up Guide
73

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cimr-pw*a series

Table of Contents