Zetor CRYSTAL HD 150 Operator's Manual page 231

Table of Contents

Advertisement

Speed of the Zuidberg front PTO
Speed of tractor with engine revolutions of 2 100 rpm and
parameter of rear wheels (km/h)
Standard and economical independent revolutions of rear
PTO shaft
Starting the engine
Starting the engine
Steps performed daily before the start of work
Steps performed every 100 hours of work
Steps performed every 50 hours of work
Steps performed every 500 hours of work
Steps performed outside the interval of 500 hours of work
Stop position
Stopping the engine
Stopping the tractor - manual brake
Suspension front drive axle
Suspension front drive axle
Swing drawbar
Swinging draw-bar console module
Swinging draw-bar console with a fixed pin module
Switch air-condition (C)
Switch box
Switch box key in the position (0)
Switch box key in the position (I)
Switch box key in the position (II)
Switches located on the control panel
Symbols of tractor nodes
System of additional treatment of exhaust gases
System of treatment of exhaust gases - setting
Technical data of engines
Technical maintenance of the tractors after a general
overhaul of the main groups
Temporary deactivation of the trailer or semi-trailer air
brakes using the handbrake lever
Tensile force
The buttons for activation of PTO shafts
The description of the system of travel clutches
The differences in ways of controlling the travel clutch by
The gauges of the tractor rear wheels equipped with solid
discs
The level of vibrations on driver´s seat
The principles of appropriate use of tractors
The processed area - setting of the width of aggregation
The socket for connection of the electrical installation of the
trailer or semi-trailer
The way of controlling the travel clutch by
Three-gear torque multiplier
Three-point hitch
230
T
INDEX
Tilting and protrusion of steering wheel
222
Toe-in of the wheels of the front driving axle
Tractor greasing scheme
220
Tractor maintenance
Tractor operation brakes
134
Tractor shutdown and recommended points for tractor
89
lifting
14
Tractors equipped with front end loader
187
Trailer brakes
187
Transport of implements
187
Transportation
187
Transportation of persons, operation
188
Travel speed calibration
155
Turning on the one pedal braking system
121
Two-hose brakes
121
Tyres and wheels
110
195
Unblocking the tractor brakes when the air pressure drops
126
Uncoupling of a single-axle trailer
127
Upper draw-bar
127
Upper working lights switching on
46
42
Urea (Aqueous Urea Solution AUS 32, DEF)
Urea (urea solution AUS 32)
42
Urea tank
42
Used operation liquids and filling - quantities
42
Using the rear control
39
63
81
Valve for filling tyre tubes with liquid
72
Vibration compensator (damper)
215
Warning signalization of air pressured drop
Warning signalization of hydrostatic steering failure
196
Washer nozzle
Water in the coarse filter of fuel
118
Wedging the front wheels
219
Weight of the front three-point hitch
132
Wheel track chang
95
Windscreen washer
95
Windscreen wiper
Windshield washer tank
172
Work with automatic disengagement of PTO shaft clutch
20
Work with PTO shaft
95
Working and transport position of the front three-point hitch
71
Working modes of PTO shafts
120
Zeroing (reset) of the indicator of service inspection
95
intervals
105
Zetor service fillings
196
Zetor tractors used for work in the woods
U
V
W
Z
36
170
194
187
29
212
21
29
155
125
15
68
114
119
29
115
128
164
38
84
193
52
190
158
174
155
114
122
26
76
176
174
169
37
37
26
136
131
167
137
62
190
23

Advertisement

Table of Contents
loading

This manual is also suitable for:

Crystal hd seriesCrystal hd 170

Table of Contents