Installing Hardware and Connectivity
• 24 mm open-end wrench
Insert the expansion anchor assemblies into the mounting holes, as shown in the
Drilling and Cutout Pattern
heads shear from the assemblies to ensure that the proper torque is applied.

Installing Cables and Power

Observe the following guidelines when installing cables, power, and ground wiring.

Installing Cables

Installing Overhead Cables

If ceiling-hung racks are used, the top Access Signal Panel Cover must be replaced with a Top Drip
Panel (P0992950) to comply with the National Electrical Code (NEC). The overhead cable trays and
the equipment required to hang them must be provided by the customer and installed according to
manufacturer instructions.

Installing Under Floor Cables

The bottom access panel must be removed and a Bottom Drip Panel assembly (P0992951) installed
to comply with Fire/Safety requirements as per NEC. The panel fits into place over the studs that are
used to secure the original access panel. Cables must be fed through the bottom access opening
before you install the Bottom Drip Panel. The drip panel must be installed before you install the
Application Processor.
Avaya Media Processing Server 1000 Hardware Installation and Maintenance
44
on page 42. Using the wrench, tighten the expansion anchors until the
Comments? infodev@avaya.com
Cabinet Base
October 2014

Advertisement

Table of Contents
loading

Table of Contents