Installing Detergent And Drying Agent Equipment; Electrical Connection Of The Equipment - Wexiodisk WD-90 DUO Installation And User Manual

Combination dishwasher
Hide thumbs Also See for WD-90 DUO:
Table of Contents

Advertisement

Installation

3.7 Installing detergent and drying agent equipment

3.7.1 Electrical connection of the equipment

5.
Loosen the plug in the bleed valve at the very top of the hood and release
any air. When water starts to bubble out of the bleed valve, the plug is
tightened.
6.
Close and open the hood again. Loosen the plug in the air valve and wait
until water bubbles out of the bleed valve. Tighten the plug.
7.
Repeat this until no more air comes out of the bleed valve. The
measurement between the machine's bottom section and the hood when
open shall be approx. 660 mm.
The dishwasher is preconfigured for connection of detergent and drying agent
equipment. The detergent and drying agent equipment is not included in delivery
of the dishwasher. Contact your detergent supplier.
Detergent and drying agent equipment is best positioned on the wall to the side
of the machine.
Remove the machine's right-hand side panel. The panel is fastened to the
frame with two screws in the panel bottom edge.
Terminals and a circuit breaker for the detergent and drying agent
equipment are located in the electrical cabinet inside the right-hand side
panel. They are shown in the figure below. See the wiring diagram for the
dishwasher.
WD-90 DUO
20
Rev. 1 (201702)
25-4-05-002_1

Advertisement

Table of Contents
loading

Table of Contents