Installation

3. Installation

3.1 General information

STOP
STOP

3.2 Requirements for the installation site

3.2.1 Lighting

3.2.2 Ventilation

3.2.3 Drain/waste pipe

The machine must only be installed by authorised personnel.
Read these instructions carefully, as they contain important information regarding
the correct installation method. The instructions should be used together with the
machine's wiring diagram and flow diagrams for water.
The machine is CE marked. The CE mark is only valid for an unmodified machine.
Any damage to the machine arising from failure to follow the instructions will in-
validate the supplier's warranty and product liability.
In order to ensure the best possible working conditions during installation, opera-
tion, servicing and maintenance, make sure that the machine is installed in a well-
lit room.
The machine produces heat and steam when in operation. In order to ensure the
best possible working conditions, the dishwashing room will require a given air
change rate. The ventilation requirements for the room are to be dimensioned on
the basis of the applicable standards.
There must be a floor drain with functioning trap for the dishwasher's waste water
and any other waste water. If a loading table is located next to the machine, the
drain for the waste pipe is best positioned under the loading table. Capacity re-
quirements for the floor drain are stated in "Technical data" on page 63.
WD-90 DUO
10
Rev. 1 (201702)