1.6 Reference Diagram
Figure 17: Configuration Example – Reference Diagram
In summary, we will provision the following:
Data Center #1
o
Will be provisioned in FI Mesh (rear port set to SPB) using a total of four VSP 7000
switches – Section 1.5.1 will cover FI mesh with four standalone switches while 1.5.3 will
cover FI mesh with two SMTL cluster
Data Center #2
Will be provisioned in dToR with SPB – although only two switches are used, a total of 16
o
switches is supported using two stacks of up to 8 switches each