LG V-NET PQCPC22N0 Installation & User Manual page 39

Acs acp
Hide thumbs Also See for V-NET PQCPC22N0:
Table of Contents

Advertisement

2
Operation ratio control setting (graph type)
There is a graph that can set the peak operation ratio control function.
To change the peak operation ratio, you can drag ◀ mark with mouse to set the Target Oper-
ating Rate.
The operation ratio of the outdoor capacity control method can be set to the following 9
stages.
9 stages of the operation ratio: 0, 40, 45, 50, 60, 70, 80, 90, 100%
3
Power control setting
On the right side of the peak operation control screen, there is a setting category that can set
the desired power consumption with the units of percentage (%).
It controls the performance of the outdoor unit not to exceed the value set here.
Desired operation ratio: sets the desired power consumption to run the peak operation func-
tion in the units of percentage (%).
(9 stages of the operation ratio: 0, 40, 45, 50, 60, 70, 80, 90, 100%)
CAUTION
!
Peak setting
• Set the peak during peak operation state or run the peak operation after setting the peak.
• If peak operation is not run after setting the peak, the actual peak operation ratio will not be
set.
Operating ACP with ACCS
39

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

V-net pqcpc22a0V-net pqcpc22a1V-net pqcpc22n1

Table of Contents