Mounting and installation
3.2

Mounting

Note
Mount the MSE6-E2M so that there is sufficient space for heat dissipation and ensure
that the maximum limit values for temperatures are observed (è Technical data).
Note
Place the MSE6-E2M in such a position in your system that the necessary air quality
class for the operating medium is maintained (è Technical Data).
Note
Fasten the MSE6-E2M with screws of size M6 and use washers, if required.
The MSE6-E2M is intended for mounting on the wall. The mounting brackets are integrated and contain
drill holes for wall mounting.
1. Ensure that the compressed air supply, as well as
the operation and load/actuator supply, are
switched off.
2. Make sure that the fastening surface is flat and can
support the weight of the MSE6-E2M.
3. Adjust the MSE6-E2M when it is standing vertically
(±5°).
4. Fasten the MSE6-E2M using the mounting brackets
and 2 screws each (è Fig. 3.1).
Make sure there is sufficient space for connecting the power supply cables and tubing.
After mounting, connect all electrical and pneumatic connections of the MSE6-E2M in this order:
1. Connect the pneumatic connections.
2. Connect the earth terminal.
3. Connect the electrical connecting cable to the power supply.
4. Connect the fieldbus cable to the bus node.