Festo MSE6-E2M Mounting, Installation, Commissioning page 41

Energy efficiency module
Hide thumbs Also See for MSE6-E2M:
Table of Contents

Advertisement

A
Technical appendix
1
Cable
2
Strain relief
Fig. A.1
Component parts of the socket and cable throughfeed
Plug connector
(Top view of device)
M18
1
2
4
3
Tab. A.3 Pin allocation, system supply
2. Open the strain relief on the rear part of the housing. Then pass the cable through.
3. Remove 5 mm of insulation from the end of the conductors and fit wire end sleeves on the stranded
wires.
4. Connect the ends of the conductors.
5. Replace the connecting part on the housing of the plug connector/socket. Pull the cable back so
that there are no loops inside the housing.
6. Tighten the strain relief.
Festo – MSE6-E2M-IN-EN – 2017-07c – English
1
4
3
4
Pin
System supply
1
24 V DC U
EL/SEN
2
24 V DC U
OUT/A
3
0 V U
/
EL/SEN
0 V U
OUT/A
4
FE
2
3
Housing
Connecting part
Function
Operating voltage supply for the electronics
and sensors
Load voltage supply for actuators
Operating load voltage
Functional earth
41

Advertisement

Table of Contents
loading

Table of Contents