4
Commissioning
4.4
Options for parameterisation
The parameterisation of the MSE6-E2M can be undertaken as follows, depending on the fieldbus pro
tocol used:
1
1
Interface module or network scanner/bus
master; the desired parameterisation can be
guaranteed, e.g. in the start-up phase or
after fieldbus interruptions.
2
User program in the higher-order PLC/IPC;
parameters can be modified during
operation.
Fig. 4.2
Options for parameterisation (as an example at the bus node CPX-FB33)
4.5
Start-up behaviour
Information on the topic of start-up behaviour can be found in Chapter 4 of the system
description for the energy efficiency module (è MSE6-E2M-SY-...).
Festo – MSE6-E2M-IN-EN – 2017-07c – English
2
3
3
Network-specific configurators; parameters
can be modified during the commissioning
phase or during troubleshooting.
4
Operator unit; parameters can be modified
during commissioning or during
troubleshooting.
4
29