Initial commissioning
4.1
Checklist for initial commissioning
Is the waste water connection installed?
Is the outlet of the tray connected?
Is the sample feed connected?
Is the electrical connection according to regulations?
Are the (optional) peripheral devices (relay connections, recorder,
etc.) connected?
Note
Please read section 5.1 B
before you start the following steps for the initial commissioning.
4.2
Switching on
1
Start the preparatory activities according to the checklist.
2
Open the enclosure door.
3
Use the mains switch to switch on the TresCon UNO
(position I). The analyzer module is heated to the temperature
that was set.
TresCon P04-P
TresCon
Ser.-Nr. 00110010
WTW 82362 Weilheim Made in Germany
TresCon PO4-P
Ablauf
Pumpschlauch Standard/Probe
blau / blau / blau
Pumpschlauch Reagenz
orange / gelb / orange
P1
P2
Thermoblock
blau
grün
green
rot
red
P3
Pump Tube Standard/Sample
blue
blue / blue / blue
V2
V4
Pump Tube Reagent
orange / yellow / orange
V1
V3
blau
gelb
orange
grün
blue
yellow
orange
green
Probe
Reinigungslösung
H O dest.
2
Standard B
Reagenz
Sample
Cleaning Solution
H O dest.
2
Standard B
Reagent
Fig. 4-1
Power switch
ASIC PRINCIPLES OF OPERATION
power switch
Initial commissioning
, page 5-1
4 - 1